CP-4(4) - Contingency Plan Testing | Full Recovery and Reconstitution

Include a full recovery and reconstitution of the system to a known state as part of contingency plan testing.


Informational References

ISO 27001

ID: CP-4(4)
Enhancement of : CP-4

Countermeasures Covered by Control

ID Name Description D3FEND

Space Threats Tagged by Control

ID Description

Sample Requirements

Requirement Rationale/Additional Guidance/Notes
The [organization] shall conduct testing of contingency plans to verify the full recovery and reconstitution of the spacecraft to its normal operational state.{CP-4(4)}
The [spacecraft] shall provide or support the capability for recovery and reconstitution to a known state after a disruption, compromise, or failure.{SV-AV-5,SV-AV-6,SV-AV-7}{CP-4(4),CP-10,CP-10(4),CP-10(6),CP-13,IR-4,IR-4(1),SA-8(16),SA-8(19),SA-8(24)}