Secondary/Backup Communication Channel

Threat actors may compromise alternative communication pathways which may not be as protected as the primary pathway. Depending on implementation the contingency communication pathways/solutions may lack the same level of security (i.e., physical security, encryption, authentication, etc.) which if forced to use could provide a threat actor an opportunity to launch attacks. Typically these would have to be coupled with other denial of service techniques on the primary pathway to force usage of secondary pathways.

ID: CM0014
Sub-techniques:  IA-0004.01 | IA-0004.02
Related Aerospace Threat IDs:  SV-MA-7
Related MITRE ATT&CK TTPs: 
Tactic:
Created: 2022/10/19
Last Modified: 2022/10/19

Countermeasures

ID Name Description NIST Rev5 D3FEND ISO 27001
CM0009 Threat Intelligence Program A threat intelligence program helps an organization generate their own threat intelligence information and track trends to inform defensive priorities and mitigate risk. Leverage all-source intelligence services or commercial satellite imagery to identify and track adversary infrastructure development/acquisition. Countermeasures for this attack fall outside the scope of the mission in the majority of cases. PM-16 PM-16(1) PM16(1) RA-10 RA-3(2) RA-3(3) SR-8 A.5.7 A.5.7 A.5.7
CM0022 Criticality Analysis Conduct a criticality analysis to identify mission critical functions, critical components, and data flows and reduce the vulnerability of such functions and components through secure system design. Focus supply chain protection on the most critical components/functions. Leverage other countermeasures like segmentation and least privilege to protect the critical components. CP-2(8) PM-11 PM-17 PM-30 PM-30(1) PM-32 RA-3(1) RA-9 RA-9 SA-15(3) SC-32(1) SC-7(29) SR-1 SR-1 SR-2 SR-2(1) SR-3 SR-3(2) SR-3(3) SR-5(1) SR-7 A.5.30 4.4 6.2 7.5.1 7.5.2 7.5.3 10.2 A.5.22 5.2 5.3 7.5.1 7.5.2 7.5.3 A.5.1 A.5.2 A.5.4 A.5.19 A.5.31 A.5.36 A.5.37 A.5.19 A.5.20 A.5.21 A.8.30 A.5.20 A.5.21 A.5.22
CM0024 Anti-counterfeit Hardware Develop and implement anti-counterfeit policy and procedures designed to detect and prevent counterfeit components from entering the information system, including tamper resistance and protection against the introduction of malicious code or hardware.  AC-20(5) CM-7(9) PM-30 PM-30(1) RA-3(1) SR-1 SR-10 SR-11 SR-11 SR-11(3) SR-11(3) SR-2 SR-2(1) SR-3 SR-4 SR-4(1) SR-4(2) SR-4(3) SR-4(4) SR-5 SR-5(2) SR-6(1) SR-9 SR-9(1) 4.4 6.2 7.5.1 7.5.2 7.5.3 10.2 5.2 5.3 7.5.1 7.5.2 7.5.3 A.5.1 A.5.2 A.5.4 A.5.19 A.5.31 A.5.36 A.5.37 A.5.19 A.5.20 A.5.21 A.8.30 A.5.20 A.5.21 A.5.21 A.8.30 A.5.20 A.5.21 A.5.23 A.8.29
CM0025 Supplier Review Conduct a supplier review prior to entering into a contractual agreement with a contractor (or sub-contractor) to acquire systems, system components, or system services. PM-30 PM-30(1) RA-3(1) SR-11 SR-3(1) SR-3(3) SR-4 SR-4(1) SR-4(2) SR-4(3) SR-4(4) SR-5 SR-5(1) SR-5(2) SR-6 SR-6 4.4 6.2 7.5.1 7.5.2 7.5.3 10.2 A.5.21 A.8.30 A.5.20 A.5.21 A.5.23 A.8.29 A.5.22
CM0027 ASIC/FPGA Manufacturing Application-Specific Integrated Circuit (ASIC) / Field Programmable Gate Arrays should be developed by accredited trusted foundries to limit potential hardware-based trojan injections. PM-30 PM-30(1) RA-3(1) SR-1 SR-1 SR-11 SR-2 SR-2(1) SR-3 SR-5 SR-5(2) SR-6(1) 4.4 6.2 7.5.1 7.5.2 7.5.3 10.2 5.2 5.3 7.5.1 7.5.2 7.5.3 A.5.1 A.5.2 A.5.4 A.5.19 A.5.31 A.5.36 A.5.37 A.5.19 A.5.20 A.5.21 A.8.30 A.5.20 A.5.21 A.5.20 A.5.21 A.5.23 A.8.29
CM0028 Tamper Protection Perform physical inspection of hardware to look for potential tampering. Leverage tamper proof protection where possible when shipping/receiving equipment. CA-8(3) CM-7(9) MA-7 PM-30 PM-30(1) RA-3(1) SC-51 SR-1 SR-1 SR-10 SR-11 SR-11(3) SR-2 SR-2(1) SR-3 SR-4(3) SR-4(4) SR-5 SR-5 SR-5(2) SR-6(1) SR-9 SR-9(1) 4.4 6.2 7.5.1 7.5.2 7.5.3 10.2 5.2 5.3 7.5.1 7.5.2 7.5.3 A.5.1 A.5.2 A.5.4 A.5.19 A.5.31 A.5.36 A.5.37 A.5.19 A.5.20 A.5.21 A.8.30 A.5.20 A.5.21 A.5.20 A.5.21 A.5.23 A.8.29
CM0021 Software Digital Signature Prevent the installation of Flight Software without verification that the component has been digitally signed using a certificate that is recognized and approved by the mission. CM-11(3) CM-14 CM-14 SA-10(1) SI-7 SI-7(12)
CM0055 Secure Command Mode(s) Provide additional protection modes for commanding the spacecraft. These can be where the spacecraft will restrict command lock based on geographic location of ground stations, special operational modes within the flight software, or even temporal controls where the spacecraft will only accept commands during certain times. AC-17(1) AC-17(10) AC-2(11) AC-2(12) AC-3 AC-3(2) AC-3(3) AC-3(4) AC-3(8) CA-3(7) SC-7 A.8.16 A.5.15 A.5.33 A.8.3 A.8.4 A.8.18 A.8.20 A.8.2 A.8.16 A.5.14 A.8.16 A.8.20 A.8.22 A.8.23 A.8.26
CM0005 Ground-based Countermeasures This countermeasure is focused on the protection of terrestrial assets like ground networks and development environments/contractor networks, etc. Traditional detection technologies and capabilities would be applicable here. Utilizing resources from NIST CSF to properly secure these environments using identify, protect, detect, recover, and respond is likely warranted. Additionally, NISTIR 8401 may provide resources as well since it was developed to focus on ground-based security for space systems (https://nvlpubs.nist.gov/nistpubs/ir/2022/NIST.IR.8401.ipd.pdf). Furthermore, the MITRE ATT&CK framework provides IT focused TTPs and their mitigations https://attack.mitre.org/mitigations/enterprise/. Several recommended NIST 800-53 Rev5 controls are provided for reference when designing ground systems/networks. AC-1 AC-10 AC-11 AC-11(1) AC-12 AC-12(1) AC-14 AC-16 AC-16(6) AC-17 AC-17(1) AC-17(10) AC-17(2) AC-17(3) AC-17(4) AC-17(6) AC-17(9) AC-18 AC-18(1) AC-18(3) AC-18(4) AC-18(5) AC-19 AC-19(5) AC-2 AC-2(1) AC-2(11) AC-2(12) AC-2(13) AC-2(2) AC-2(3) AC-2(4) AC-2(9) AC-20 AC-20(1) AC-20(2) AC-20(3) AC-20(5) AC-21 AC-22 AC-3 AC-3(11) AC-3(13) AC-3(15) AC-3(4) AC-4 AC-4(23) AC-4(24) AC-4(25) AC-4(26) AC-4(31) AC-4(32) AC-6 AC-6(1) AC-6(10) AC-6(2) AC-6(3) AC-6(5) AC-6(8) AC-6(9) AC-7 AC-8 AT-2(4) AT-2(4) AT-2(5) AT-2(6) AT-3 AT-3(2) AT-4 AU-10 AU-11 AU-12 AU-12(1) AU-12(3) AU-14 AU-14(1) AU-14(3) AU-2 AU-3 AU-3(1) AU-4 AU-4(1) AU-5 AU-5(1) AU-5(2) AU-5(5) AU-6 AU-6(1) AU-6(3) AU-6(4) AU-6(5) AU-6(6) AU-7 AU-7(1) AU-8 AU-9 AU-9(2) AU-9(3) AU-9(4) CA-3 CA-3(6) CA-3(7) CA-7 CA-7(1) CA-7(6) CA-8 CA-9 CM-10(1) CM-11 CM-11(2) CM-11(3) CM-12 CM-12(1) CM-14 CM-2 CM-2(2) CM-2(3) CM-2(7) CM-3 CM-3(1) CM-3(2) CM-3(5) CM-3(7) CM-3(7) CM-3(8) CM-4 CM-5(1) CM-5(5) CM-6 CM-6(1) CM-6(2) CM-7 CM-7(1) CM-7(2) CM-7(3) CM-7(5) CM-7(8) CM-7(8) CM-7(9) CM-8 CM-8(1) CM-8(2) CM-8(3) CM-8(4) CM-9 CP-10 CP-10(2) CP-10(4) CP-2 CP-2(2) CP-2(5) CP-2(8) CP-3(1) CP-4(5) CP-8 CP-8(1) CP-8(2) CP-8(3) CP-8(4) CP-8(5) CP-9 CP-9(1) CP-9(2) CP-9(3) IA-11 IA-12 IA-12(1) IA-12(2) IA-12(3) IA-12(4) IA-12(5) IA-12(6) IA-2 IA-2(1) IA-2(12) IA-2(2) IA-2(5) IA-2(6) IA-2(8) IA-3 IA-3(1) IA-4 IA-4(9) IA-5 IA-5(1) IA-5(13) IA-5(14) IA-5(2) IA-5(7) IA-5(8) IA-6 IA-7 IA-8 IR-2 IR-2(2) IR-2(3) IR-3(3) IR-4 IR-4(1) IR-4(11) IR-4(11) IR-4(12) IR-4(13) IR-4(14) IR-4(3) IR-4(4) IR-4(6) IR-4(7) IR-4(8) IR-5 IR-5(1) IR-6 IR-6(1) IR-7 IR-7(1) MA-2 MA-3 MA-3(1) MA-3(2) MA-3(3) MA-4 MA-4(1) MA-4(3) MA-4(6) MA-4(7) MA-5(1) MA-6 MA-7 MP-2 MP-3 MP-4 MP-5 MP-5(4) MP-6 MP-6(3) MP-7 PE-3(7) PL-10 PL-11 PL-8 PL-8(1) PL-8(2) PL-9 PL-9 PM-11 PM-16(1) PM-17 PM-30 PM-30(1) PM-31 PM-32 RA-10 RA-3(1) RA-3(2) RA-3(2) RA-3(3) RA-3(4) RA-5 RA-5(10) RA-5(11) RA-5(2) RA-5(4) RA-5(5) RA-7 RA-9 RA-9 SA-10 SA-10(1) SA-10(7) SA-11 SA-11(2) SA-11(9) SA-15 SA-15(3) SA-15(7) SA-17 SA-2 SA-22 SA-3 SA-3(1) SA-3(2) SA-3(2) SA-4 SA-4(1) SA-4(10) SA-4(12) SA-4(2) SA-4(3) SA-4(5) SA-4(7) SA-4(9) SA-5 SA-8 SA-8(14) SA-8(15) SA-8(18) SA-8(21) SA-8(22) SA-8(23) SA-8(24) SA-8(9) SA-9 SA-9(1) SA-9(2) SA-9(6) SA-9(7) SC-10 SC-12 SC-12(1) SC-12(6) SC-13 SC-15 SC-16(2) SC-16(3) SC-18(1) SC-18(2) SC-18(3) SC-18(4) SC-2 SC-2(2) SC-20 SC-21 SC-22 SC-23 SC-23(1) SC-23(3) SC-23(5) SC-24 SC-28 SC-28(1) SC-28(11) SC-28(3) SC-3 SC-38 SC-39 SC-4 SC-45 SC-45(1) SC-45(1) SC-45(2) SC-49 SC-5 SC-5(1) SC-5(2) SC-5(3) SC-50 SC-51 SC-7 SC-7(10) SC-7(11) SC-7(12) SC-7(13) SC-7(14) SC-7(18) SC-7(21) SC-7(25) SC-7(29) SC-7(3) SC-7(4) SC-7(5) SC-7(5) SC-7(7) SC-7(8) SC-7(9) SC-8 SC-8(1) SC-8(2) SC-8(5) SI-10 SI-10(3) SI-10(6) SI-11 SI-14(3) SI-16 SI-19(4) SI-2 SI-2(2) SI-2(3) SI-2(6) SI-21 SI-3 SI-3 SI-3(10) SI-4 SI-4(1) SI-4(10) SI-4(11) SI-4(12) SI-4(14) SI-4(15) SI-4(16) SI-4(2) SI-4(20) SI-4(22) SI-4(23) SI-4(25) SI-4(4) SI-4(5) SI-5 SI-5(1) SI-6 SI-7 SI-7(1) SI-7(17) SI-7(2) SI-7(5) SI-7(7) SI-7(8) SR-1 SR-1 SR-10 SR-11 SR-11 SR-11(1) SR-11(2) SR-11(3) SR-12 SR-2 SR-2(1) SR-3 SR-3(1) SR-3(2) SR-3(2) SR-3(3) SR-4 SR-4(1) SR-4(2) SR-4(3) SR-4(4) SR-5 SR-5 SR-5(1) SR-5(2) SR-6 SR-6(1) SR-6(1) SR-7 SR-7 SR-8 SR-9 SR-9(1) 5.2 5.3 7.5.1 7.5.2 7.5.3 A.5.1 A.5.2 A.5.4 A.5.15 A.5.31 A.5.36 A.5.37 A.5.16 A.5.18 A.8.2 A.8.16 A.5.15 A.5.33 A.8.3 A.8.4 A.8.18 A.8.20 A.8.2 A.8.4 A.5.14 A.8.22 A.8.23 A.8.11 A.8.10 A.5.15 A.8.2 A.8.18 A.8.5 A.8.5 A.7.7 A.8.1 A.5.14 A.6.7 A.8.1 A.8.16 A.5.14 A.8.1 A.8.20 A.5.14 A.7.9 A.8.1 A.5.14 A.7.9 A.8.20 A.6.3 A.8.15 A.8.15 A.8.6 A.5.25 A.6.8 A.8.15 A.7.4 A.8.17 A.5.33 A.8.15 A.5.28 A.8.15 A.8.15 A.8.15 A.5.14 A.8.21 9.1 9.3.2 9.3.3 A.5.36 9.2.2 A.8.9 A.8.9 8.1 9.3.3 A.8.9 A.8.32 A.8.9 A.8.9 A.8.9 A.8.9 A.8.19 A.8.19 A.5.9 A.8.9 A.5.2 A.8.9 A.8.19 7.5.1 7.5.2 7.5.3 A.5.2 A.5.29 A.8.1 A.8.6 A.5.30 A.5.29 A.7.11 A.5.29 A.5.33 A.8.13 A.5.29 A.5.16 A.5.16 A.5.16 A.5.17 A.8.5 A.5.16 A.6.3 A.5.25 A.5.26 A.5.27 A.8.16 A.5.5 A.6.8 A.7.10 A.7.13 A.8.10 A.8.10 A.8.16 A.8.10 A.7.13 A.5.10 A.7.7 A.7.10 A.5.13 A.5.10 A.7.7 A.7.10 A.8.10 A.5.10 A.7.9 A.7.10 A.5.10 A.7.10 A.7.14 A.8.10 A.5.10 A.7.10 A.5.8 A.5.7 4.4 6.2 7.5.1 7.5.2 7.5.3 10.2 4.4 6.2 7.4 7.5.1 7.5.2 7.5.3 9.1 9.2.2 10.1 10.2 A.8.8 6.1.3 8.3 10.2 A.5.22 A.5.7 A.5.2 A.5.8 A.8.25 A.8.31 A.8.33 8.1 A.5.8 A.5.20 A.5.23 A.8.29 A.8.30 A.8.28 7.5.1 7.5.2 7.5.3 A.5.37 A.8.27 A.8.28 A.5.2 A.5.4 A.5.8 A.5.14 A.5.22 A.5.23 A.8.21 A.8.9 A.8.28 A.8.30 A.8.32 A.8.29 A.8.30 A.5.8 A.8.25 A.8.25 A.8.27 A.8.6 A.5.14 A.8.16 A.8.20 A.8.22 A.8.23 A.8.26 A.8.23 A.8.12 A.5.10 A.5.14 A.8.20 A.8.26 A.5.33 A.8.20 A.8.24 A.8.24 A.8.26 A.5.31 A.5.14 A.5.10 A.5.33 A.6.8 A.8.8 A.8.32 A.8.7 A.8.16 A.8.16 A.8.16 A.5.6 A.8.11 A.8.10 5.2 5.3 7.5.1 7.5.2 7.5.3 A.5.1 A.5.2 A.5.4 A.5.19 A.5.31 A.5.36 A.5.37 A.5.19 A.5.20 A.5.21 A.8.30 A.5.20 A.5.21 A.5.21 A.8.30 A.5.20 A.5.21 A.5.23 A.8.29 A.5.22 A.5.22
CM0014 Secure boot Software/Firmware must verify a trust chain that extends through the hardware root of trust, boot loader, boot configuration file, and operating system image, in that order. The trusted boot/RoT computing module should be implemented on radiation tolerant burn-in (non-programmable) equipment.  SC-51 SI-7(9)

References