Require the developer of the system, system component, or system service to produce a plan for continuous monitoring of control effectiveness that is consistent with the continuous monitoring program of the organization.
| ID | Name | Description | D3FEND | |
| ID | Description | |
| SPARTA ID | Requirement | Rationale/Additional Guidance/Notes |
|---|---|---|
| SPR-408 | The [organization] shall produce a plan for the continuous monitoring of security control effectiveness. The plan shall explicitly cover the space platform and link segment telemetry, automated anomaly detection, and SOC correlation of uplink, crosslink, and payload communications.{SV-DCO-1,SV-IT-1,SV-AV-1}{SA-4(8),CP-4(5),PM-31} | Comprehensive coverage ensures both onboard and communication segments are monitored. Telemetry-driven detection strengthens anomaly awareness. SOC correlation integrates space and ground visibility. Structured planning enhances detection capability. |
| ID | Name | Description | |
|---|---|---|---|