SR-9(1) - Tamper Resistance and Detection | Multiple Stages of System Development Life Cycle

Employ anti-tamper technologies, tools, and techniques throughout the system development life cycle.


ID: SR-9(1)
Enhancement of : SR-9

Space Segment Guidance

Plan inspection touchpoints at receipt, pre-integration, post-environmental test, and pre-range ship. Consider structured checklists for visual/microscopic review; verification of seals/markings; imaging of high-risk assemblies; and scans for unexpected radios or interfaces. Compare physical/electrical measurements (weight, current draw, emissions profiles) to baselines to spot hidden alterations, and record results, photos, serials, lot data, so later comparisons are straightforward.